SITUAÇÃO ATUAL / CURRENT STATUS | EM OPERAÇÃO / IN OPERATION |
| |
1. GERAL / GENERAL | |
| |
NOME DA USINA / STATION NAME | ANGRA 1 |
REGIÃO / REGION | ANGRA DOS REIS |
ESTADO / STATE | RIO DE JANEIRO |
COORDENADAS / COORDINATES | |
LATITUDE(Graus, Min., Seg.) / LATITUDE (Deg., Min., Sec.) | 23o 00' 30" " SUL |
LONGITUDE (Graus, Min., Seg.) / LONGIT. (Deg., Min., Sec.) | 44o 28' 26" OESTE |
TIPO DE REATOR / TYPE OF REACTOR | ÁGUA PRESSURIZADA / PWR |
FORNECEDOR DO SISTEMA / REACTOR SYSTEM SUPPLIER | WESTINGHOUSE |
PROPRIETÁRIO / OWNER | ELETROBRAS ELETRONUCLEAR |
OPERADOR / OPERATOR | ELETROBRAS ELETRONUCLEAR |
| |
2. ENDEREÇOS PARA CORRESPONDÊNCIA / MAILING ADDRESS: | |
| |
ENDEREÇO DA USINA / STATION ADDRESS | CENTRAL NUCLEAR ALMIRANTE ÁLVARO ALBERTO (CNAAA) BR 101 SUL – ROD. GOV. MÁRIO COVAS, KM 517 (RIO – SANTOS) CEP: 23948-000 ANGRA DOS REIS RIO DE JANEIRO -BRASIL |
TELEFONE / FAX DA USINA STATION TELEPHONE/FAX | TEL: (24) 3362-9000 FAX: (24) 3362-9090 |
TELEFONE/FAX DA ELETRONUCLEAR (SEDE)/ MAIN OFFICES TELEPHONE /FAX | TEL: (21) 2588-7000 FAX: (21) 2588-7200 |
| |
3. POTÊNCIA DO REATOR / OUTPUT PER REACTOR UNIT | |
| |
TÉRMICA / NUCLEAR THERMAL(NSSS: 1876+6) | NOMINAL / CURRENT: 1.882 MWt |
ELÉTRICA (BRUTA) / GROSS ELECTRICAL (*) | NOMINAL / CURRENT: 640 MWe |
ELÉTRICA (LÍQUIDA) / NET ELECTRICAL (*) | NOMINAL / CURRENT: 609 MWe |
FAIXA OPERACIONAL CONTÍNUA / CONTINUOUS OPERATIONAL RANGE | 80% -100% |
RENDIMENTO TÉRMICO / THERMAL EFFICIENCY | 34.2 % (Temp. água do mar 27˚C) |
(*) Dados obtidos após troca de GVs | |
| |
4. EVENTOS PRINCIPAIS / MAIN EVENTS: | |
| |
AUTORIZAÇÃO PARA INSTALAÇÃO DA USINA / PLANT INSTALLATION AUTHORIZATION | Portaria 416, 13.07.70 (DNAEE) (Carta CNEN-C-37 / 84) |
APROVAÇÃO DO LOCAL / SITE APPROVAL | Carta CNEN nº 190/70, 27.04.70 |
LICENÇA DE CONSTRUÇÃO REQUERIDA POR FURNAS ( Envio do Relatório Preliminar de Análise de Segurança - RPAS) | 12 / 72 |
INÍCIO DA CONSTRUÇÃO / START OF CONSTRUCTION (CONCRETAGEM DA LAJE DO PRÉDIO DO REATOR ) / BASE PLATE CONCRETE WORKS) | 29.03.1972 |
ASSINATURA DO CONTRATO PRINCIPAL Nº 1934 COM A FIRMA WESTINGHOUSE | 07.04.72 |
LICENÇA FINAL DE CONSTRUÇÃO / CONSTRUCTION LICENCE (Análise do RPAS pela CNEN de acordo com a Resojução CNEN-06/72) | Relatórios DR-nº 44/74 e DR-nº 51/74; Comunicação Formal: Ofício CNEN nº 82/74, 02.05.74 |
INÍCIO DA MONTAGEM ELETROMECÂNICA / START OF ELECTROMECHANICAL ERECTION | 1975 |
ENVIO DO RELATÓRIO FINAL DE ANÁLISE DE SEGURANÇA (RFAS) PARA A CNEN / FINAL SAFETY ANALYSIS REPORT (FSAR) SUBMISION | Carta DEM.T.E. 99/77, 27.04.77 |
INÍCIO DO COMISSIONAMENTO / START OF COMMISSIONING | 07.77 |
TESTE HIDROSTÁTICO A FRIO / HYDROSTATIC TEST (COLD) | 07.79 |
TESTE FUNCIONAL A QUENTE / HOT OPERATION TEST | 18.12.80 |
APROVAÇÃO DO RELATÓRIO DE AVALIAÇÃO DE SEGURANÇA / SAFETY EVALUATION REPORT APPROVAL - (parte do Relatório DR-103/81) | Res. CNEN nº 09/81, 11.09.81 |
AUTORIZAÇÃO PROVISÓRIA PARA OPERÇÃO (APO) / PROVISIONAL OPERATION AUTHORIZATION (Concedida a Furnas pelo prazo de 1 ano e prorrogada diversas vezes até a AOI) | Res. CNEN nº 10/81, 10.09.81 - (APO - RP/01) emitida pela Comissão Deliberativa (CD) da CNEN |
PRIMEIRO CARREGAMENTO DO NÚCLEO / FIRST CORE LOADING | 20.09.81 |
PRIMEIRA CRITICALIDADE DO REATOR / REACTO FIRST CRITICALITY | 13.03.1982 (20:23h) |
PRIMEIRA SINCRONIZAÇÃO NA REDE / FIRST SYNCHRONIZATION TO GRID | 01.04.82 (15:26h ) |
1ª PRORROGAÇÃO DA APO | res. CNEN 09/82 |
UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER | 28.02.1984 (21:50h) |
LICENÇA PARA OPERAÇÃO COMERCIAL / COMMERCIAL OPER. AUTHORIZATION | 20.12.84 |
INÍCIO DA OPERAÇÃO COMERCIAL / START OF COMMERCIAL OPERATION | 01.01.85 (Confirmado pela carta CNEN-C-37 / 84) |
ENVIO DO RELATÓRIO FINAL DE COMISSIONAMENTO PARA A CNEN / FINAL COMMISSIONING REPORT SUBMISSION | FURNAS LQ.N.E. 052/85 (03/85) |
AUTORIZAÇÃO PARA OPERAÇÃO INICIAL /INITIAL OPERATION AUTHORIZATION (Concedida a Furnas com vigência até 05.03.93) | Resolução CNEN nº 18/87, 23.12.87 - AOI-RP/01 (5 págs.) (D.O.U. 14.01.88) |
SOLICITAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / REQUEST FOR PERMANENT OPERATION AUTHORIZATION | FURNAS de 06.05.91 - complementada pela carta LQ.N.E.059.94, 09.02.04 |
AUTORIZAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / PERMANENT OPERATION AUTHORIZATION - (Concedida a Furnas - Base RFAS - Rev. 26) | Portaria CNEN nº 344/94, 07.12.94 (D.O.U. 09.12.94). Renovação da Autorização para Operação Permanente (AOP) - (Ofício nº 124/10 CGRC/CNEN, 09.08.2010) - (D.O.U. 20.09.10) - Válida por 14 anos. |
| |
TROCA DOS GERADORS DE VAPOR (GVs) / STEAM GENERATORS SUSTITUTION | PARADA 1P16 |
| |
INÍCIO DA PARADA / OUTAGE START | 24.01.09 |
AUTORIZAÇÃO PARA REALIZAR OS TESTES FUNCIONAIS E ATIV. DE COMISSIONAMENTO | OFÍCIO NO. 104/09-CGRC/CNEN, 15.05.09 |
TÉRMINO DA PARADA / OUTAGE WORKS END | 02.06.09 |
REATOR CRITICALIZADO / REACTOR CRITICALITY | 04.06.09 (13:55h) |
SINCRONIZAÇÃO NA REDE / SYNCHRONIZATION TO GRID (TÉRMINO OFICIAL DA PARADA 1P16) | 04.06.09 (22:10h) |
UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER | 16.06.09 (04:20h) |
| |
5. CARACTERÍSTICAS DO NÚCLEO DO REATOR /REACTOR CORE CHARACTERISTICS | |
| |
MATERIAL COMBUSTÍVEL / FUEL MATERIAL | URÂNIO ENRIQUECIDO-UO2 / ENRICHED URANIUM |
NO. DE ELEMENTOS COMBUSTÍVEIS / NUMBER OF FUEL ELEMENTS | 121 |
QUANTIDADE DE VARETAS COMBUSTÍVEIS POR ELEMENTO COMBUSTÍVEL / NUMBER OF FUEL RODS PER ASSEMBLY | 235 |
ENRIQUECIMENTO INICIAL DO COMBUSTÍVEL (MÉDIA) / INITIAL FUEL ENRICHMENT (MEAN) | 2.6 (WT%) |
ENRIQUECIMENTO DO COMBUSTÍVEL NO RECARREGAMENTO / AVERAGE RELOAD FUEL ENRICHMENT | 4.0 (WT%) (ATUAL/PRESENT) |
MATERIAL DO REVESTIMENTO / CLADDING MATERIAL | ZIRLOTM |
ESPESSURA / THICKNESS | 0.535 mm |
INVENTÁRIO DE URÂNIO / FUEL LOADING | 49,5 t U |
DENSIDADE MÉDIA DE POTÊNCIA DO COMBUSTÍVEL/ MEAN POWER DENSITY IN FUEL | 37,9 (kW/kg U) |
DENSIDADE MÉDIA DE POTÊNCIA DO NÚCLEODO REATOR / MEAN POWER DENSITY IN CORE | 106,25 (W/cm3) |
POTÊNCIA LINEAR MÉDIA NOMINAL DAS VARETAS / MEAN LINEAR POWER DENSITY | 17.6 (kW/m) |
IRRADIAÇÃO FINAL / DISCHARGE BURN-UP | 55.000 (MWd/t) (MÁXIMA média) |
| |
6. MÉTODO DE CARREGAMENTO / METHOD OF REFUELING: | |
| |
FREQUÊNCIA DE CARREGAMENTO (PROJETO) / DESIGN FREQUENCY OF REFUELING | APROX. 12 MESES/ APROX. 12 MONTHS |
PARTES DO NÚCLEO RETIRADAS / PARTS OF CORE WITHDRAWN (Elem. Combustíveis / Fuel Rods) | APROX. 33% |
MEIOS DE CONTROLE DE RADIOATIVIDADE / MEANS OF REACTIVITY CONTROL | CONTROL, BURNABLE POISON=BORO SILICATO, CHEMICAL SYSTEM |
BARRAS DE CONTROLE / CONTROL BARS | 33 |
| |
7. SISTEMAS DA USINA / PLANT SYSTEMS | |
| |
VASO DO REATOR (MATERIAL BÁSICO) / REACTOR VESSEL (BASIC MATERIAL) | SA 533 GRAU A CLASSE 2, SA 508 CLASSE 2 |
MATERIAL DO REVESTIMENTO / CLADDING MATERIAL | AISI 304 / INCONEL |
| |
DESCRIÇÃO DO SISTEMA PRIMÁRIO / PRIMARY SYSTEM DESCRIPTION | 2 "LOOPS' |
| |
NO. DE BOMBAS DO PRIMÁRIO / Nr. OF PRIMARY PUMPS | 2 |
PRESSÃO DO PRIMÁRIO / PRIMARY PRESSURE | 157.1 (kg/cm2) |
REFRIGERANTE / COOLANT | H2O |
VAZÃO ATRAVÉS DO NÚCLEO / MASS FLOW THROUGH CORE | 35.958 (t/h) |
TEMPERATURA MÉDIA / OUTLET TEMPERATURY (AVERAGE). | 302.7 (oC) |
| |
8. GERADOR DE VAPOR / STEAM GENERATOR | 2 |
TIPO / TYPE (Substituição concluída em Junho de 2009) / (Substitution concluded in June 2009) | VERTICAL, TUBOS EM "U" COM ANEL DE ALIMENTAÇÃO / vertical "U" -tube with feed-ring |
FABRICANTE / MANUFACTURER | AREVA (NUCLEP) |
MODELO / MODEL | SG 72W / D3 |
MATERIAL | SA-508 GRAU 3 CLASSE 2 |
TUBOS / TUBES | INCONEL 690 TT |
| |
9. TURBINAS: / TURBINES | 1 |
| |
ESTÁGIOS / RATING | 1AP, 2BP / 1 HP, 2 LP |
RPM | 1.800 |
| |
10. CONDIÇÕES DO VAPOR NA ENTRADA DA TURBINA / STEAM CONDITIONS AT TURBINE INLET | |
| |
TEMPERATURA / TEMPERATURE | 315 (oC) |
PRESSÃO / PRESSURE | 80 (kg/cm2) |
UMIDADE / MOISTURE CONTENT | 0.1 (%) |
VAZÃO / FLOW | 3.704 (t/h) |
| |
11. TIPO DE REFRIGERAÇÃO DO CONDENSADOR / TYPE OF CONDENSER COOLING | SEAWATER COOLING |
| |
VAZÃO NA CAPTAÇÃO / SEAWATER FLOW | 38,53 (m3/s) |
MATERIAL /MATERIAL | ASTM A-285 C |
TUBOS / TUBES | TITANIO / TITANIUM – (ASME B-338 GR. 02) |
| |
12. CONTENÇÃO DO SISTEMA DO REATOR:/ REACTOR SYSTEM CONTAINMENT | ENVOLTÓRIO DE CONTENÇÃO DE AÇO C/ ENVOLTÓRIO ADICIONAL DE CONCRETO / steel containment vessel with reinforced concrete shield |
MATERIAL / MATERIAL | ASTM A516 GR. 70 |
| |
13. GERADOR ELÉTRICO / ELECTRIC GENERATOR | 1 |
FABRICANTE / MANUFACTURER | WESTINGHOUSE / SIEMENS |
TIPO / TYPE: | HORIZONTAL, RESFRIADO A H2/HORIZONTAL, H2 COOLED |
POTÊNCIA (A 75 psig H2) / POWER (AT 75 psig H2) | 760 MVA |
TENSÃO DE SAÍDA / OUTLET TENSION | 19 kV |
NÚMERO DE FASES / NUMBER OF PHASES | 3 |
FREQUÊNCIA / FREQUENCY | 60 Hz |
FATOR DE POTÊNCIA / POWER FACTOR | 0.9 |
CLASSE DE ISOLAMENTO / INSULATION CLASS | B |
RPM | 1.800 |
| |
14. GERADOR DIESEL DE EMERGÊNCIA / EMERGENCY DIESEL GENERATOR | |
| |
DG-1A / DG-1B ( Originais) | 2 UNIDADES / 2 UNITS |
FABRICANTE / MANUFACTURER | FAIRBANKS MORSE (COLT INDUSTRIES) |
POTÊNCIA NOMINAL P/ CADA ONJUNTO / NOMINAL POWER (EACH SET) | 2.850 kW - 4.063 kVA |
FATOR DE POTÊNCIA / POWER FACTOR | 1 - 0.8 |
FREQUENCIA / FREQUENCY | 60Hz |
RPM | 900 |
| |
DG-3 / DG-4 (Transferidos de Angra 2) | 2 UNIDADES / 2 UNITS |
FABRICANTE / MANUFACTURER | KHD / SIEMENS |
POTÊNCIA NOMINAL P/ CADA CONJUNTO / NOMINAL POWER (EACH SET) | 5.400 kW - 6.600 kVA |
FATOR DE POTÊNCIA / POWER FACTOR | 1 - 0.8 |
FREQUENCIA / FREQUENCY | 60Hz |
RPM | 900
|