ANGRA 1 - INFORMAÇÕES GERAIS / HISTÓRICO / DADOS BÁSICOS 

 

 

SITUAÇÃO ATUAL / CURRENT STATUS

EM OPERAÇÃO / IN OPERATION


1. GERAL / GENERAL

 
 

NOME DA USINA / STATION NAME

ANGRA 1

REGIÃO / REGION

ANGRA DOS REIS

ESTADO / STATE

RIO DE JANEIRO

COORDENADAS  / COORDINATES

 

LATITUDE(Graus, Min., Seg.) / LATITUDE (Deg., Min., Sec.) 23o 00’ 30" SUL
LONGITUDE (Graus, Min., Seg.) / LONGIT. (Deg., Min., Sec.) 44o 28’ 26” OESTE

TIPO DE REATOR / TYPE OF REACTOR

ÁGUA PRESSURIZADA / PWR

FORNECEDOR DO SISTEMA / REACTOR SYSTEM SUPPLIER

WESTINGHOUSE

PROPRIETÁRIO / OWNER

ELETROBRAS ELETRONUCLEAR
OPERADOR / OPERATOR  

ELETROBRAS ELETRONUCLEAR


2. ENDEREÇOS PARA CORRESPONDÊNCIA

 / MAILING ADDRESS:

 
   

ENDEREÇO DA USINA / STATION ADDRESS

CENTRAL NUCLEAR ALMIRANTE ÁLVARO

ALBERTO (CNAAA) BR 101 SUL – ROD. GOV. MÁRIO

COVAS, KM 517 (RIO – SANTOS) CEP: 23948-000 ANGRA DOS REIS RIO DE JANEIRO -BRASIL

TELEFONE / FAX DA USINA

STATION TELEPHONE/FAX

TEL: (24) 3362-9000

FAX: (24) 3362-9090

TELEFONE/FAX DA ELETRONUCLEAR (SEDE)/

MAIN OFFICES TELEPHONE /FAX

TEL: (21) 2588-7000 FAX: (21) 2588-7200


3. POTÊNCIA DO REATOR / OUTPUT PER REACTOR UNIT

 
   
TÉRMICA / NUCLEAR THERMAL(NSSS: 1876+6) NOMINAL / CURRENT:  1.882 MWt

ELÉTRICA (BRUTA) / GROSS ELECTRICAL (*)

NOMINAL / CURRENT: 640 MWe

ELÉTRICA (LÍQUIDA) / NET ELECTRICAL (*)

NOMINAL / CURRENT: 609 MWe

FAIXA OPERACIONAL CONTÍNUA /

CONTINUOUS OPERATIONAL RANGE

80% -100%

RENDIMENTO TÉRMICO / THERMAL EFFICIENCY

34.2 % (Temp. água do mar 27˚C)

(*) Dados obtidos após troca de GVs  

4. EVENTOS PRINCIPAIS / MAIN EVENTS:

 
   
AUTORIZAÇÃO PARA INSTALAÇÃO DA USINA /

PLANT INSTALLATION AUTHORIZATION

Portaria 416, 13.07.70 (DNAEE) (Carta CNEN-C-37 / 84)
APROVAÇÃO DO LOCAL / SITE APPROVAL Carta CNEN  nº 190/70, 27.04.70

LICENÇA DE CONSTRUÇÃO REQUERIDA POR FURNAS ( Envio do Relatório Preliminar de Análise de Segurança - RPAS) 

12 / 72
INÍCIO DA CONSTRUÇÃO / START OF CONSTRUCTION (CONCRETAGEM DA LAJE DO PRÉDIO DO REATOR ) /  BASE PLATE CONCRETE WORKS) 29.03.1972
ASSINATURA DO CONTRATO PRINCIPAL Nº 1934 COM A FIRMA WESTINGHOUSE 07.04.72
LICENÇA FINAL DE CONSTRUÇÃO / CONSTRUCTION LICENCE (Análise do RPAS pela CNEN de acordo com a Resojução CNEN-06/72) Relatórios DR-nº 44/74 e DR-nº 51/74; Comunicação Formal: Ofício CNEN nº 82/74, 02.05.74
INÍCIO DA MONTAGEM ELETROMECÂNICA / START OF ELECTROMECHANICAL ERECTION 1975
ENVIO DO RELATÓRIO FINAL DE ANÁLISE DE SEGURANÇA (RFAS) PARA A CNEN / FINAL SAFETY ANALYSIS REPORT (FSAR) SUBMISION  

 

Carta DEM.T.E. 99/77, 27.04.77

INÍCIO DO COMISSIONAMENTO / START OF COMMISSIONING

07.77

TESTE HIDROSTÁTICO A FRIO / HYDROSTATIC TEST (COLD) 07.79
TESTE FUNCIONAL A QUENTE / HOT OPERATION TEST 18.12.80
APROVAÇÃO DO RELATÓRIO DE AVALIAÇÃO DE SEGURANÇA / SAFETY EVALUATION REPORT APPROVAL - (parte do Relatório DR-103/81) Res. CNEN nº 09/81, 11.09.81
 AUTORIZAÇÃO PROVISÓRIA PARA OPERÇÃO (APO) / PROVISIONAL OPERATION AUTHORIZATION ( Concedida a Furnas pelo prazo de 1 ano e prorrogada diversas vezes até a AOI)  Res. CNEN nº 10/81, 10.09.81 - (APO - RP/01) emitida pela Comissão Deliberativa (CD) da CNEN
PRIMEIRO CARREGAMENTO DO NÚCLEO / FIRST CORE LOADING 20.09.81
PRIMEIRA CRITICALIDADE DO REATOR / REACTO FIRST CRITICALITY 13.03.1982 (20:23h)
PRIMEIRA SINCRONIZAÇÃO NA REDE / FIRST SYNCHRONIZATION TO GRID 01.04.82 (15:26h )
1ª PRORROGAÇÃO DA APO res. CNEN 09/82
UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER  28.02.1984 (21:50h)
LICENÇA PARA OPERAÇÃO COMERCIAL / COMMERCIAL OPER. AUTHORIZATION 20.12.84
INÍCIO DA OPERAÇÃO COMERCIAL / START OF COMMERCIAL OPERATION  01.01.85 (Confirmado pela carta CNEN-C-37 / 84)
ENVIO DO RELATÓRIO FINAL DE COMISSIONAMENTO PARA A CNEN / FINAL COMMISSIONING REPORT SUBMISSION FURNAS LQ.N.E. 052/85 (03/85)
AUTORIZAÇÃO PARA OPERAÇÃO INICIAL /INITIAL OPERATION AUTHORIZATION (Concedida a Furnas com vigência até 05.03.93) Resolução CNEN nº 18/87, 23.12.87 - AOI-RP/01 (5 págs.) (D.O.U. 14.01.88)
SOLICITAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / REQUEST FOR PERMANENT OPERATION AUTHORIZATION FURNAS de 06.05.91 - complementada pela carta LQ.N.E.059.94, 09.02.04
AUTORIZAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / PERMANENT OPERATION AUTHORIZATION - (Concedida a Furnas - Base RFAS - Rev. 26)

 Portaria CNEN nº 344/94, 07.12.94 (D.O.U. 09.12.94).

Renovação da Autorização para Operação Permanente (AOP) - (Ofício nº 124/10 CGRC/CNEN, 09.08.2010) - (D.O.U. 20.09.10) - Válida por 14 anos.

   
TROCA DOS GERADORS DE VAPOR (GVs) / STEAM GENERATORS SUSTITUTION PARADA 1P16
   
INÍCIO DA PARADA / OUTAGE START  24.01.09
AUTORIZAÇÃO PARA REALIZAR OS TESTES FUNCIONAIS E ATIV. DE COMISSIONAMENTO OFÍCIO NO. 104/09-CGRC/CNEN, 15.05.09
TÉRMINO DA PARADA / OUTAGE WORKS END 02.06.09
REATOR CRITICALIZADO / REACTOR CRITICALITY 04.06.09 (13:55h)
SINCRONIZAÇÃO NA REDE / SYNCHRONIZATION TO GRID (TÉRMINO OFICIAL DA PARADA 1P16) 04.06.09 (22:10h)
UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER 16.06.09 (04:20h)

5. CARACTERÍSTICAS DO NÚCLEO DO

REATOR /REACTOR CORE CHARACTERISTICS

 
   

MATERIAL COMBUSTÍVEL / FUEL MATERIAL

URÂNIO ENRIQUECIDO-UO2  /

ENRICHED URANIUM  

NO. DE ELEMENTOS COMBUSTÍVEIS / NUMBER OF FUEL ELEMENTS

121

QUANTIDADE DE VARETAS COMBUSTÍVEIS POR ELEMENTO COMBUSTÍVEL / NUMBER OF FUEL RODS PER ASSEMBLY

235

ENRIQUECIMENTO INICIAL DO COMBUSTÍVEL

(MÉDIA) / INITIAL FUEL ENRICHMENT (MEAN)

2.6 (WT%)

ENRIQUECIMENTO DO COMBUSTÍVEL NO

RECARREGAMENTO / AVERAGE RELOAD FUEL ENRICHMENT

4.0 (WT%) (ATUAL/PRESENT)

MATERIAL DO REVESTIMENTO / CLADDING MATERIAL ZIRLOTM

ESPESSURA / THICKNESS

0.535 mm
INVENTÁRIO DE URÂNIO / FUEL LOADING

49,5 t U

DENSIDADE MÉDIA DE POTÊNCIA DO COMBUSTÍVEL/ MEAN POWER DENSITY IN FUEL

37,9 (kW/kg U)
DENSIDADE MÉDIA DE POTÊNCIA DO NÚCLEODO REATOR / MEAN POWER DENSITY IN CORE

106,25 (W/cm3)

POTÊNCIA LINEAR MÉDIA NOMINAL DAS VARETAS / MEAN LINEAR POWER DENSITY

17.6 (kW/m)

IRRADIAÇÃO FINAL / DISCHARGE BURN-UP

55.000 (MWd/t) (MÁXIMA média)

6. MÉTODO DE CARREGAMENTO / METHOD

OF REFUELING:

 
   

FREQUÊNCIA DE CARREGAMENTO (PROJETO) /

DESIGN FREQUENCY OF REFUELING

APROX. 12 MESES/ APROX. 12

MONTHS

PARTES DO NÚCLEO RETIRADAS / PARTS OF CORE WITHDRAWN (Elem. Combustíveis / Fuel Rods)

APROX. 33%

MEIOS DE CONTROLE DE RADIOATIVIDADE / MEANS OF REACTIVITY CONTROL

CONTROL, BURNABLE POISON=BORO SILICATO, CHEMICAL SYSTEM

BARRAS DE CONTROLE / CONTROL BARS

33 


7. SISTEMAS DA USINA / PLANT SYSTEMS  
   

VASO DO REATOR (MATERIAL BÁSICO) / REACTOR VESSEL (BASIC MATERIAL)

SA 533 GRAU A CLASSE 2, SA 508 CLASSE 2

MATERIAL DO REVESTIMENTO / CLADDING MATERIAL AISI 304 / INCONEL
   

DESCRIÇÃO DO SISTEMA PRIMÁRIO / PRIMARY SYSTEM DESCRIPTION

2 "LOOPS'
   

NO. DE BOMBAS DO PRIMÁRIO  / Nr. OF PRIMARY PUMPS

2

PRESSÃO DO PRIMÁRIO / PRIMARY PRESSURE 157.1 (kg/cm2)
REFRIGERANTE / COOLANT

H2O

VAZÃO ATRAVÉS DO NÚCLEO / MASS FLOW THROUGH CORE

35.958 (t/h)

TEMPERATURA MÉDIA / OUTLET TEMPERATURY (AVERAGE). 302.7 (oC)

8. GERADOR DE VAPOR / STEAM GENERATOR

TIPO / TYPE  (Substituição concluída em Junho de 2009) / (Substitution concluded in June 2009)

VERTICAL, TUBOS EM “U” COM ANEL DE ALIMENTAÇÃO / vertical "U" -tube with feed-ring

FABRICANTE / MANUFACTURER

AREVA (NUCLEP)

MODELO / MODEL

SG 72W / D3

MATERIAL SA-508 GRAU 3 CLASSE 2

TUBOS / TUBES

INCONEL 690 TT

9. TURBINAS: / TURBINES 1
   

ESTÁGIOS / RATING

1AP, 2BP / 1 HP, 2 LP

RPM 1.800

10. CONDIÇÕES DO VAPOR NA ENTRADA DA TURBINA / STEAM CONDITIONS AT TURBINE INLET  
   
TEMPERATURA / TEMPERATURE 315 (oC)
PRESSÃO / PRESSURE 80 (kg/cm2)
UMIDADE / MOISTURE CONTENT 0.1 (%)

VAZÃO / FLOW

3.704 (t/h)


11. TIPO DE REFRIGERAÇÃO DO

CONDENSADOR / TYPE OF CONDENSER

COOLING

SEAWATER COOLING

   

VAZÃO NA CAPTAÇÃO / SEAWATER FLOW

38,53 (m3/s)

MATERIAL /MATERIAL

ASTM A-285 C 

TUBOS / TUBES

TITANIO / TITANIUM – (ASME B-338 GR. 02)


12. CONTENÇÃO DO SISTEMA DO REATOR:/ REACTOR SYSTEM CONTAINMENT

ENVOLTÓRIO DE CONTENÇÃO DE AÇO C/ ENVOLTÓRIO ADICIONAL DE CONCRETO / steel containment vessel with reinforced concrete shield

MATERIAL / MATERIAL

ASTM A516 GR. 70


13. GERADOR ELÉTRICO / ELECTRIC GENERATOR

1

FABRICANTE / MANUFACTURER

WESTINGHOUSE / SIEMENS
TIPO / TYPE:

HORIZONTAL, RESFRIADO A H2 /HORIZONTAL, H2 COOLED

POTÊNCIA (A 75 psig H2) / POWER (AT 75 psig H2)

760 MVA

TENSÃO DE SAÍDA / OUTLET TENSION

19 kV

NÚMERO DE FASES / NUMBER OF PHASES

3

FREQUÊNCIA / FREQUENCY

60 Hz

FATOR DE POTÊNCIA / POWER FACTOR

0.9

CLASSE DE ISOLAMENTO / INSULATION CLASS

B

RPM

1.800


14. GERADOR DIESEL DE EMERGÊNCIA / EMERGENCY DIESEL GENERATOR 

 

   
DG-1A / DG-1B ( Originais) 2 UNIDADES / 2 UNITS
FABRICANTE / MANUFACTURER

FAIRBANKS MORSE (COLT INDUSTRIES)

POTÊNCIA NOMINAL P/ CADA ONJUNTO / NOMINAL POWER (EACH SET)

2.850 kW - 4.063 kVA

FATOR DE POTÊNCIA / POWER FACTOR

1 - 0.8

FREQUENCIA / FREQUENCY 60Hz

RPM 

900

 

 

DG-3 / DG-4 (Transferidos de Angra 2)

2 UNIDADES / 2 UNITS

FABRICANTE / MANUFACTURER KHD / SIEMENS
POTÊNCIA NOMINAL P/ CADA CONJUNTO / NOMINAL POWER (EACH SET) 5.400 kW - 6.600 kVA
FATOR DE POTÊNCIA / POWER FACTOR 1 - 0.8
FREQUENCIA / FREQUENCY 60Hz
RPM 900

  • Sede


    Rua da Candelária, 65 – Centro
    CEP: 20091–906
    Tel:(21) 2588–7000
    Fax: (21) 2588–7200

  • Central Nuclear Almirante Álvaro Alberto


    BR 101 Sul - Rodovia Governador Mário Covas,
    km 517 (Rio Santos) – Itaorna
    4° Dist. de Angra dos Reis – RJ
    CEP: 23948–000
    Tel:(24) 3362–9000
    Fax:(24) 3362–9090

  • Escritório de Brasília


    Ed. Via Capital, 15
    andar, salas 1505/08
    CEP: 70041–906
    Tel/Fax:(61) 3328–0555

  • Escritório no Recife


    Rua Agenor Lopes, 25, sala 503
    Empresarial Itamaraty – Boa Viagem
    Recife – Pernambuco
    CEP: 51021–110
    Tel/Fax:(81) 3326–5443

 

 

 

 

 

  •  
  • Eletrobras | Eletronuclear - Todos os direitos reservados ©