|
SITUAÇÃO ATUAL / CURRENT STATUS
|
EM OPERAÇÃO / IN OPERATION
|
|
|
1. GERAL / GENERAL
|
|
| |
|
NOME DA USINA / STATION NAME
|
ANGRA 1
|
|
REGIÃO / REGION
|
ANGRA DOS REIS
|
|
ESTADO / STATE
|
RIO DE JANEIRO |
|
COORDENADAS / COORDINATES
|
|
| LATITUDE(Graus, Min., Seg.) / LATITUDE (Deg., Min., Sec.) |
23o 00’ 30" ” SUL |
| LONGITUDE (Graus, Min., Seg.) / LONGIT. (Deg., Min., Sec.) |
44o 28’ 26” OESTE |
|
TIPO DE REATOR / TYPE OF REACTOR
|
ÁGUA PRESSURIZADA / PWR
|
| FORNECEDOR DO SISTEMA / REACTOR SYSTEM SUPPLIER |
WESTINGHOUSE
|
|
PROPRIETÁRIO / OWNER
|
ELETROBRAS ELETRONUCLEAR |
| OPERADOR / OPERATOR |
ELETROBRAS ELETRONUCLEAR
|
|
| 2. ENDEREÇOS PARA CORRESPONDÊNCIA
/ MAILING ADDRESS:
|
|
| |
|
|
ENDEREÇO DA USINA / STATION ADDRESS
|
CENTRAL NUCLEAR ALMIRANTE ÁLVARO
ALBERTO (CNAAA) BR 101 SUL – ROD. GOV. MÁRIO
COVAS, KM 517 (RIO – SANTOS) CEP: 23948-000 ANGRA DOS REIS RIO DE JANEIRO -BRASIL
|
|
TELEFONE / FAX DA USINA
STATION TELEPHONE/FAX
|
TEL: (24) 3362-9000
FAX: (24) 3362-9090
|
|
TELEFONE/FAX DA ELETRONUCLEAR (SEDE)/
MAIN OFFICES TELEPHONE /FAX
|
TEL: (21) 2588-7000 FAX: (21) 2588-7200
|
|
|
3. POTÊNCIA DO REATOR / OUTPUT PER REACTOR UNIT
|
|
| |
|
| TÉRMICA / NUCLEAR THERMAL(NSSS: 1876+6) |
NOMINAL / CURRENT: 1.882 MWt |
|
ELÉTRICA (BRUTA) / GROSS ELECTRICAL (*)
|
NOMINAL / CURRENT: 640 MWe |
|
ELÉTRICA (LÍQUIDA) / NET ELECTRICAL (*)
|
NOMINAL / CURRENT: 609 MWe
|
|
FAIXA OPERACIONAL CONTÍNUA /
CONTINUOUS OPERATIONAL RANGE
|
80% -100%
|
|
RENDIMENTO TÉRMICO / THERMAL EFFICIENCY
|
34.2 % (Temp. água do mar 27˚C)
|
| (*) Dados obtidos após troca de GVs |
|
|
|
4. EVENTOS PRINCIPAIS / MAIN EVENTS:
|
|
| |
|
| AUTORIZAÇÃO PARA INSTALAÇÃO DA USINA /
PLANT INSTALLATION AUTHORIZATION
|
Portaria 416, 13.07.70 (DNAEE) (Carta CNEN-C-37 / 84) |
| APROVAÇÃO DO LOCAL / SITE APPROVAL |
Carta CNEN nº 190/70, 27.04.70 |
|
LICENÇA DE CONSTRUÇÃO REQUERIDA POR FURNAS ( Envio do Relatório Preliminar de Análise de Segurança - RPAS)
|
12 / 72 |
| INÍCIO DA CONSTRUÇÃO / START OF CONSTRUCTION (CONCRETAGEM DA LAJE DO PRÉDIO DO REATOR ) / BASE PLATE CONCRETE WORKS) |
29.03.1972 |
| ASSINATURA DO CONTRATO PRINCIPAL Nº 1934 COM A FIRMA WESTINGHOUSE |
07.04.72 |
| LICENÇA FINAL DE CONSTRUÇÃO / CONSTRUCTION LICENCE (Análise do RPAS pela CNEN de acordo com a Resojução CNEN-06/72) |
Relatórios DR-nº 44/74 e DR-nº 51/74; Comunicação Formal: Ofício CNEN nº 82/74, 02.05.74 |
| INÍCIO DA MONTAGEM ELETROMECÂNICA / START OF ELECTROMECHANICAL ERECTION |
1975 |
| ENVIO DO RELATÓRIO FINAL DE ANÁLISE DE SEGURANÇA (RFAS) PARA A CNEN / FINAL SAFETY ANALYSIS REPORT (FSAR) SUBMISION |
Carta DEM.T.E. 99/77, 27.04.77
|
| INÍCIO DO COMISSIONAMENTO / START OF COMMISSIONING |
07.77
|
| TESTE HIDROSTÁTICO A FRIO / HYDROSTATIC TEST (COLD) |
07.79 |
| TESTE FUNCIONAL A QUENTE / HOT OPERATION TEST |
18.12.80 |
| APROVAÇÃO DO RELATÓRIO DE AVALIAÇÃO DE SEGURANÇA / SAFETY EVALUATION REPORT APPROVAL - (parte do Relatório DR-103/81) |
Res. CNEN nº 09/81, 11.09.81 |
| AUTORIZAÇÃO PROVISÓRIA PARA OPERÇÃO (APO) / PROVISIONAL OPERATION AUTHORIZATION ( Concedida a Furnas pelo prazo de 1 ano e prorrogada diversas vezes até a AOI) |
Res. CNEN nº 10/81, 10.09.81 - (APO - RP/01) emitida pela Comissão Deliberativa (CD) da CNEN |
| PRIMEIRO CARREGAMENTO DO NÚCLEO / FIRST CORE LOADING |
20.09.81 |
| PRIMEIRA CRITICALIDADE DO REATOR / REACTO FIRST CRITICALITY |
13.03.1982 (20:23h) |
| PRIMEIRA SINCRONIZAÇÃO NA REDE / FIRST SYNCHRONIZATION TO GRID |
01.04.82 (15:26h ) |
| 1ª PRORROGAÇÃO DA APO |
res. CNEN 09/82 |
| UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER |
28.02.1984 (21:50h) |
| LICENÇA PARA OPERAÇÃO COMERCIAL / COMMERCIAL OPER. AUTHORIZATION |
20.12.84 |
| INÍCIO DA OPERAÇÃO COMERCIAL / START OF COMMERCIAL OPERATION |
01.01.85 (Confirmado pela carta CNEN-C-37 / 84) |
| ENVIO DO RELATÓRIO FINAL DE COMISSIONAMENTO PARA A CNEN / FINAL COMMISSIONING REPORT SUBMISSION |
FURNAS LQ.N.E. 052/85 (03/85) |
| AUTORIZAÇÃO PARA OPERAÇÃO INICIAL /INITIAL OPERATION AUTHORIZATION (Concedida a Furnas com vigência até 05.03.93) |
Resolução CNEN nº 18/87, 23.12.87 - AOI-RP/01 (5 págs.) (D.O.U. 14.01.88) |
| SOLICITAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / REQUEST FOR PERMANENT OPERATION AUTHORIZATION |
FURNAS de 06.05.91 - complementada pela carta LQ.N.E.059.94, 09.02.04 |
| AUTORIZAÇÃO PARA OPERAÇÃO PERMANENTE (AOP) / PERMANENT OPERATION AUTHORIZATION - (Concedida a Furnas - Base RFAS - Rev. 26) |
Portaria CNEN nº 344/94, 07.12.94 (D.O.U. 09.12.94).
Renovação da Autorização para Operação Permanente (AOP) - (Ofício nº 124/10 CGRC/CNEN, 09.08.2010) - (D.O.U. 20.09.10) - Válida por 14 anos.
|
| |
|
| TROCA DOS GERADORS DE VAPOR (GVs) / STEAM GENERATORS SUSTITUTION |
PARADA 1P16 |
| |
|
| INÍCIO DA PARADA / OUTAGE START |
24.01.09 |
| AUTORIZAÇÃO PARA REALIZAR OS TESTES FUNCIONAIS E ATIV. DE COMISSIONAMENTO |
OFÍCIO NO. 104/09-CGRC/CNEN, 15.05.09 |
| TÉRMINO DA PARADA / OUTAGE WORKS END |
02.06.09 |
| REATOR CRITICALIZADO / REACTOR CRITICALITY |
04.06.09 (13:55h) |
| SINCRONIZAÇÃO NA REDE / SYNCHRONIZATION TO GRID (TÉRMINO OFICIAL DA PARADA 1P16) |
04.06.09 (22:10h) |
| UNIDADE ATINGIU 100% DE POTÊNCIA NUCLEAR / UNIT REACHED 100% POWER |
16.06.09 (04:20h) |
|
| 5. CARACTERÍSTICAS DO NÚCLEO DO
REATOR /REACTOR CORE CHARACTERISTICS
|
|
| |
|
|
MATERIAL COMBUSTÍVEL / FUEL MATERIAL
|
URÂNIO ENRIQUECIDO-UO2 /
ENRICHED URANIUM
|
|
NO. DE ELEMENTOS COMBUSTÍVEIS / NUMBER OF FUEL ELEMENTS
|
121 |
|
QUANTIDADE DE VARETAS COMBUSTÍVEIS POR ELEMENTO COMBUSTÍVEL / NUMBER OF FUEL RODS PER ASSEMBLY
|
235
|
| ENRIQUECIMENTO INICIAL DO COMBUSTÍVEL
(MÉDIA) / INITIAL FUEL ENRICHMENT (MEAN)
|
2.6 (WT%)
|
|
ENRIQUECIMENTO DO COMBUSTÍVEL NO
RECARREGAMENTO / AVERAGE RELOAD FUEL ENRICHMENT
|
4.0 (WT%) (ATUAL/PRESENT)
|
| MATERIAL DO REVESTIMENTO / CLADDING MATERIAL |
ZIRLOTM |
|
ESPESSURA / THICKNESS
|
0.535 mm |
| INVENTÁRIO DE URÂNIO / FUEL LOADING |
49,5 t U
|
|
DENSIDADE MÉDIA DE POTÊNCIA DO COMBUSTÍVEL/ MEAN POWER DENSITY IN FUEL
|
37,9 (kW/kg U) |
| DENSIDADE MÉDIA DE POTÊNCIA DO NÚCLEODO REATOR / MEAN POWER DENSITY IN CORE |
106,25 (W/cm3)
|
|
POTÊNCIA LINEAR MÉDIA NOMINAL DAS VARETAS / MEAN LINEAR POWER DENSITY
|
17.6 (kW/m) |
|
IRRADIAÇÃO FINAL / DISCHARGE BURN-UP
|
55.000 (MWd/t) (MÁXIMA média) |
|
| 6. MÉTODO DE CARREGAMENTO / METHOD
OF REFUELING:
|
|
| |
|
|
FREQUÊNCIA DE CARREGAMENTO (PROJETO) /
DESIGN FREQUENCY OF REFUELING
|
APROX. 12 MESES/ APROX. 12
MONTHS
|
|
PARTES DO NÚCLEO RETIRADAS / PARTS OF CORE WITHDRAWN (Elem. Combustíveis / Fuel Rods)
|
APROX. 33%
|
|
MEIOS DE CONTROLE DE RADIOATIVIDADE / MEANS OF REACTIVITY CONTROL
|
CONTROL, BURNABLE POISON=BORO SILICATO, CHEMICAL SYSTEM
|
| BARRAS DE CONTROLE / CONTROL BARS |
33
|
|
| 7. SISTEMAS DA USINA / PLANT SYSTEMS |
|
| |
|
|
VASO DO REATOR (MATERIAL BÁSICO) / REACTOR VESSEL (BASIC MATERIAL)
|
SA 533 GRAU A CLASSE 2, SA 508 CLASSE 2
|
| MATERIAL DO REVESTIMENTO / CLADDING MATERIAL |
AISI 304 / INCONEL |
| |
|
|
DESCRIÇÃO DO SISTEMA PRIMÁRIO / PRIMARY SYSTEM DESCRIPTION
|
2 "LOOPS' |
| |
|
|
NO. DE BOMBAS DO PRIMÁRIO / Nr. OF PRIMARY PUMPS
|
2
|
| PRESSÃO DO PRIMÁRIO / PRIMARY PRESSURE |
157.1 (kg/cm2) |
| REFRIGERANTE / COOLANT |
H2O
|
| VAZÃO ATRAVÉS DO NÚCLEO / MASS FLOW THROUGH CORE |
35.958 (t/h)
|
| TEMPERATURA MÉDIA / OUTLET TEMPERATURY (AVERAGE). |
302.7 (oC) |
|
|
8. GERADOR DE VAPOR / STEAM GENERATOR
|
2
|
|
TIPO / TYPE (Substituição concluída em Junho de 2009) / (Substitution concluded in June 2009)
|
VERTICAL, TUBOS EM “U” COM ANEL DE ALIMENTAÇÃO / vertical "U" -tube with feed-ring |
|
FABRICANTE / MANUFACTURER
|
AREVA (NUCLEP)
|
|
MODELO / MODEL
|
SG 72W / D3
|
| MATERIAL |
SA-508 GRAU 3 CLASSE 2 |
|
TUBOS / TUBES
|
INCONEL 690 TT |
|
| 9. TURBINAS: / TURBINES |
1 |
| |
|
|
ESTÁGIOS / RATING
|
1AP, 2BP / 1 HP, 2 LP
|
| RPM |
1.800 |
|
| 10. CONDIÇÕES DO VAPOR NA ENTRADA DA TURBINA / STEAM CONDITIONS AT TURBINE INLET |
|
| |
|
| TEMPERATURA / TEMPERATURE |
315 (oC) |
| PRESSÃO / PRESSURE |
80 (kg/cm2) |
| UMIDADE / MOISTURE CONTENT |
0.1 (%) |
|
VAZÃO / FLOW
|
3.704 (t/h)
|
|
|
11. TIPO DE REFRIGERAÇÃO DO
CONDENSADOR / TYPE OF CONDENSER
COOLING
|
SEAWATER COOLING
|
| |
|
|
VAZÃO NA CAPTAÇÃO / SEAWATER FLOW
|
38,53 (m3/s) |
|
MATERIAL /MATERIAL
|
ASTM A-285 C
|
|
TUBOS / TUBES
|
TITANIO / TITANIUM – (ASME B-338 GR. 02)
|
|
| 12. CONTENÇÃO DO SISTEMA DO REATOR:/ REACTOR SYSTEM CONTAINMENT |
ENVOLTÓRIO DE CONTENÇÃO DE AÇO C/ ENVOLTÓRIO ADICIONAL DE CONCRETO / steel containment vessel with reinforced concrete shield
|
|
MATERIAL / MATERIAL
|
ASTM A516 GR. 70
|
|
|
13. GERADOR ELÉTRICO / ELECTRIC GENERATOR
|
1
|
|
FABRICANTE / MANUFACTURER
|
WESTINGHOUSE / SIEMENS |
| TIPO / TYPE: |
HORIZONTAL, RESFRIADO A H2 /HORIZONTAL, H2 COOLED
|
|
POTÊNCIA (A 75 psig H2) / POWER (AT 75 psig H2)
|
760 MVA |
|
TENSÃO DE SAÍDA / OUTLET TENSION
|
19 kV |
|
NÚMERO DE FASES / NUMBER OF PHASES
|
3
|
|
FREQUÊNCIA / FREQUENCY
|
60 Hz |
|
FATOR DE POTÊNCIA / POWER FACTOR
|
0.9
|
|
CLASSE DE ISOLAMENTO / INSULATION CLASS
|
B
|
|
RPM
|
1.800
|
|
|
14. GERADOR DIESEL DE EMERGÊNCIA / EMERGENCY DIESEL GENERATOR
|
|
| |
|
| DG-1A / DG-1B ( Originais) |
2 UNIDADES / 2 UNITS |
| FABRICANTE / MANUFACTURER |
FAIRBANKS MORSE (COLT INDUSTRIES)
|
|
POTÊNCIA NOMINAL P/ CADA ONJUNTO / NOMINAL POWER (EACH SET)
|
2.850 kW - 4.063 kVA
|
| FATOR DE POTÊNCIA / POWER FACTOR |
1 - 0.8
|
| FREQUENCIA / FREQUENCY |
60Hz |
|
RPM
|
900
|
|
|
|
| DG-3 / DG-4 (Transferidos de Angra 2) |
2 UNIDADES / 2 UNITS
|
| FABRICANTE / MANUFACTURER |
KHD / SIEMENS |
| POTÊNCIA NOMINAL P/ CADA CONJUNTO / NOMINAL POWER (EACH SET) |
5.400 kW - 6.600 kVA |
| FATOR DE POTÊNCIA / POWER FACTOR |
1 - 0.8 |
| FREQUENCIA / FREQUENCY |
60Hz |
| RPM |
900 |